Designed to provide a smooth startup, HPE 3PAR StoreServ 8000, 9000, and 20000 Storage Installation and Startup Service provides deployment of your HPE 3PAR StoreServ 8000, 9000, and 20000 Storage. The service helps ensure proper installation in your storage environment and helps you increase the benefit from your storage investment.


The service provides activities required to help you deploy your HPE 3PAR StoreServ 8000, 9000, and 20000 Storage into operation. With the assistance of your designated IT storage administrator, an HPE service specialist deploys your array as more fully described in the Service features table.


When ordered with hardware upgrade products, the service also provides deployment of hardware upgrades to your existing HPE 3PAR StoreServ 8000, 9000, and 20000 Storage.


The service includes the following:

  • For new arrays, configuration and presentation of a test virtual volume using nonproduction data for up to two hosts
  • For array upgrades, installation and configuration of the array upgrade products as further detailed in the following sections

What is excluded:

  • Reconfiguring your existing array — for example, virtual volumes, hosts, or a SAN — is outside the scope of this service.
  • For installation of the array into a rack, supply, assembly, configuration, and positioning of the rack are excluded from this service.

Refer to additional exclusions in the Service limitations section.

  • Service benefits

    • Allows your IT resources to stay focused on their core tasks and priorities
    • Helps reduce implementation time, as well as the impact on and risk to your storage environment
    • Is designed to help ensure a successful implementation by providing HPE installation planning and coordination
    • Provides service delivered by a trained specialist and based on HPE recommended configurations and best practices
    • Helps you more effectively utilize your HPE 3PAR StoreServ Storage, thanks to the knowledge you gain from the service specialist during service delivery
  • Service feature highlights

    • Service planning and coordination
    • Service deployment
    • Installation verification tests (IVTs)
    • Customer-orientation session
  • Service features

Feature

Delivery specifications

Service planning and coordination

An HPE service specialist will plan all the necessary activities, including identifying any prerequisites (see the Service eligibility section), and schedule the service delivery at a time mutually agreed upon by Hewlett Packard Enterprise and the Customer. It shall be during local HPE standard business hours, excluding HPE holidays, unless otherwise agreed by HPE. Any services outside HPE standard business hours may be subject to additional charges. The service specialist will provide the planning and coordination activities, either remotely or on-site, at HPE’s discretion.

The service specialist will perform the following installation planning and coordination activities:

  • Communicate with the Customer, which includes fielding their queries regarding service delivery and requesting any information needed from the Customer
  • Verify, using a predelivery checklist, that all service prerequisites have been met, including that the Customer has completed verification that the Customer’s host and SAN environment are compatible with any required HPE 3PAR Operating System upgrades or patches prior to delivery of the installation services
  • Schedule the array deployment at a mutually agreed upon time
  • Facilitate a brief discussion to guide the Customer in defining array configuration objectives based on application performance, availability needs, virtual volume layout, and HPE best practices

Service deployment

The service specialist will perform the following array deployment activities:

  • Coordinate the installation.
  • Install HPE 3PAR StoreServ Storage hardware and upgrades according to the product specifications.
  • Upgrade to the latest the HPE 3PAR Operating System release and confirm that the OS is at a supported and appropriate version.
  • Initialize the array.
  • Assist the Customer with installing HPE 3PAR StoreServ Management Console software on a Customer-provided server if the Customer requests.
  • Verify that the license keys for the purchased HPE 3PAR Operating System Software Suite array-based features are installed, the Customer has access to appropriate product documentation, and the Customer understands how to obtain additional optional integration assistance if required.
  • Create and present a test virtual volume using nonproduction data for up to two hosts for the initial installation of an array.
  • Verify that the required HPE 3PAR Operating System version or patches are installed for hardware performance, capacity, and functionality upgrades, as applicable; if they are not installed, and the Customer is entitled to updates, install the required HPE 3PAR Operating System updates or patches while installing and initializing any purchased upgrade components.
  • Provide the Customer with instructions on accessing appropriate product documentation of HPE 3PAR beyond the HPE 3PAR Operating System Software Suite and how to obtain additional optional integration assistance, if required.
  • Offer limited integration of up to two hosts (physical or virtual) running a single OS into a preexisting operational SAN/network consisting of switch technologies that meet the supportability standards or any other HPE supported configuration; integration of a host is defined as the performance of the following essential tasks necessary to establish and confirm visibility of a test virtual volume to the intended host:
    • Advise the Customer of zoning and multipathing requirements based on the host implementation guides, including, as applicable, limited use of HPE Smart SAN to demonstrate zoning for the two hosts referenced previously if the Customer’s environment is HPE Smart SAN capable and the array being deployed via this service has HPE Smart SAN licensed
    • Verify that the Customer has read/write access to virtual volumes from the target hosts
    • Confirm that the Customer has path failover and failback functionality to the target hosts
  • For the HPE 3PAR StoreServ Service Processor:
    • For the HPE 3PAR StoreServ 8000 and 9000 Storage, install and configure Virtual Service Processor software on a supported host provided by the Customer, or
    • For the HPE 3PAR StoreServ 8000, 9000, and 20000 Storage, install the HPE 3PAR StoreServ Service Processor host into the same rack with the HPE 3PAR StoreServ Storage product and configure the Service Processor software
  • Configure the appropriate supported HPE remote support and monitoring solution.

IVTs

The service specialist will perform the appropriate IVTs to confirm product functionality, including verification that:

  • The event logs are accumulating data.
  • Visibility of a test virtual volume using nonproduction data for up to two hosts, as applicable, can be confirmed.
  • The remote support and monitoring solution is installed and operational, as applicable.

Customer-orientation session

For installation of a new array, the service specialist will conduct an orientation session of up to 1-hour duration for the HPE 3PAR StoreServ 8000 Storage and up to 4-hour duration for HPE 3PAR StoreServ 9000 and 20000 Storage, to review the configuration information and demonstrate basic operation of the installed HPE 3PAR StoreServ Storage product.

During the orientation session, the service specialist may:

  • Provide the Customer with information about how to obtain array configuration information
  • Demonstrate the creation of a virtual volume
  • Highlight the basic operation of the virtual or physical service processor, array hardware, and HPE 3PAR Operating System
  • Verify that the Customer understands how to gain access to product documentation
  • Provide an overview of the system architecture
  • Inform the Customer how to contact HPE for support
  • Hold a brief question and answer forum with the Customer

For upgrade installation, the service specialist will conduct an orientation session of up to 1-hour duration, with to review the configuration following service delivery.

The orientation session is provided on the same day as the installation. The session is informal and is typically conducted at a management console with selected members of the Customer’s staff. It is not intended as a classroom activity or substitute for formal product training.

  • Service limitations

    Unless specified in this document or a separate statement of work (SOW), activities such as, but not limited to, the following are excluded from this service:

    • Full site inspection, such as comprehensive analysis of the Customer’s power, cooling and humidity, airborne contaminant, and vibration levels, and determination of whether the data center’s raised floor has the sufficient structural capacity to accommodate the weight of the array to be installed; separate services are available for these tasks
    • Integration with any hardware or software components not supported by the HPE 3PAR StoreServ Storage product
    • Implementation of software revisions, including hotfixes, patches, service packs, or upgrades from prior versions, on the Customer’s existing SAN and host environment
    • Running of major revisions to the HPE 3PAR StoreServ Storage factory configuration; if needed, such revisions may require additional services
    • Compatibility planning to ensure that required HPE 3PAR Operating System upgrades or patches are compatible with the Customer’s host and SAN environment
    • Configuration, consulting, Customer orientation, and training for HPE 3PAR software such as HPE 3PAR File Persona Software Suite, HPE 3PAR Security Software Suite, HPE 3PAR Application Software Suite, HPE 3PAR Reporting Software, HPE 3PAR Adaptive Optimization Software, HPE 3PAR Dynamic Optimization Software, HPE 3PAR Peer Motion Software, HPE 3PAR Virtual Copy Software, and Multipath I/O (MPIO); separate services are available for these products
    • Redesigning or reconfiguration of the existing array for hardware upgrades or software add-ons, including hardware reconfiguration, for example, to accommodate a physical service processor added as an upgrade
    • Extensive racking, reracking, or cabling activities, including cabling activities involving conduits, raceways, patch panels, and movement/configuration of computer room floor panels
    • Software downgrades to HPE 3PAR Operating System; downgrades are limited to currently supported versions compatible with the HPE 3PAR StoreServ Storage hardware configuration only
    • Reconfiguration of existing environments, such as removal or movement of array disk drives and adapter cards, conversion and reformatting of existing storage between RAID levels or emulation types, or installation of extensive Fibre Channel and/or SAS cabling
    • Design or implementation of high availability and other complex configurations, such as host clustering
    • Design or implementation of host-based logical volumes and associated file system structures
    • Deployment activities, including planning, design, assessment, and configuration of switch technology related to the implementation of a new SAN or the redeployment or extension of an existing SAN
    • Performance testing or modeling
    • Installation or configuration of any hardware or software products external to the array subsystem, including, but not limited to, servers, host operating systems, host agent software, multipathing software, tape libraries, host bus adapters (HBAs), network, SAN fabric, and enterprise backup software
    • Migration of existing data to the new array or a new configuration within an existing array, such as the migration of existing data to thin-provisioned virtual volumes
    • Loading, management, or manipulation of the Customer’s data
    • Operational testing of applications or troubleshooting of interconnectivity, network, compatibility, or problems not related to the HPE 3PAR StoreServ Storage product
    • Assembly, configuration, and positioning of the Customer-supplied rack for the rackmount version of the array product; this limitation is applicable to any rack (including generic HPE racks)
    • For the HPE 3PAR StoreServ 8000 and 9000 Virtual Service Processor software; assembly, configuration, and racking of the Customer-supplied host
    • Design or implementation of seismic bracing or supports
    • Relocation services — Relocation is available as a separate service that is scheduled separately

    For installation of the HPE 3PAR StoreServ Storage product, additional activities such as, but not limited to, the following are excluded from this service:

    • Integration of more than two hosts (physical or virtual) into a preexisting operational SAN, consisting of switch technologies that meet the supportability standards or any other HPE supported configuration
    • Virtual volume design or implementation beyond validation for up to two hosts, that a test virtual volume is visible; if a virtual volume or host implementation is required, the HPE Storage Virtual Volume Design and Implementation Service is available separately

    For installation of HPE 3PAR StoreServ Storage upgrades, additional activities such as, but not limited to, the following are excluded from this service:

    • Physical movement of existing drives or data movement between drives within the array to rebalance data; HPE 3PAR Rebalance Service is available separately for this purpose
    • Integration of hosts (physical or virtual) into a preexisting operational SAN
    • SAN reconfiguration activities, including migration of hosts from HBAs replaced during a node upgrade process; SAN services are available separately
  • Service eligibility

    The Customer must meet certain hardware and software prerequisites prior to on-site service delivery. These prerequisites include, but are not limited to, the following:

    • The Customer’s existing computing operating system platforms must be supported by and compatible with the HPE 3PAR StoreServ Storage product being installed.
    • The Customer’s SAN environment must be fully operational in a configuration supported by HPE, and connectivity must be available and operational in the location where the array will be installed.
    • The Customer must provide and verify a suitable physical operating environment for the array product, including implementing any power, cooling, and other environmental requirements.
    • For the rackmount version of the array product, the Customer is responsible for assembling and configuring the Customer-supplied rack and positioning it in the location where the array will be installed. This requirement is applicable to any rack (including generic HPE racks).
    • For array upgrade installation, the HPE 3PAR StoreServ Storage product must be fully operational, in a supported configuration, and physically located where the upgrade will be installed.
    • The Customer is responsible for determining and installing any HPE required host- or SAN-based software upgrades, patches, device drivers, or multipathing software.
    • The Customer is responsible for providing servers/workstations and network provisioning that meet the requirements for software products as applicable, such as Virtual Service Processor and HPE 3PAR StoreServ Management Console.
    • The Customer must provide appropriate network provisioning to enable the HPE remote support and monitoring solution.
  • Customer responsibilities

    The Customer will:

    • Contact an HPE service specialist within 90 days of the date of purchase to schedule the service delivery
    • Coordinate service deployment on third-party–maintained products (if applicable) with HPE
    • Ensure that all service prerequisites, as identified in the Service eligibility section, have been met prior to service delivery
    • Complete and return the prerequisite HPE predelivery checklist to the service specialist at least two weeks prior to the start of the service, including array configuration information for upgrade installations, as necessary
    • Assign a designated person from the Customer’s staff who, on behalf of the Customer, will grant all approvals, provide information, and otherwise be available to assist HPE in facilitating the service delivery
    • Ensure that all hardware, firmware, and software that the service specialist will need to deliver this service are available and that software products are properly licensed
    • Ensure the availability, at all times during service delivery, of one or more individuals who will provide administrator-level access to the systems where the work is to be performed
    • Provide all network and administration assistance necessary to enable connectivity to the HPE 3PAR StoreServ Storage product to allow HPE remote monitoring and support tools to communicate with the HPE Support Center
    • Deliver all administration necessary to enable end-to-end connectivity of the HPE 3PAR StoreServ Storage product, including network, SAN fabric, and host
    • Provide server and network provisioning that meet the requirements for additional software products, such as HPE 3PAR StoreServ Management Console
    • Ensure that all prerequisite firmware or driver dependencies for the environment are handled before on-site service delivery begins
    • Place HPE 3PAR StoreServ Storage products in the immediate location where the installation service will take place; HPE will unpack products to be installed in a Customer-supplied rack
    • Assemble and configure the Customer-supplied rack for the rackmount version of the array product and position it in the location where the array will be installed; this requirement is applicable to any rack (including generic HPE racks) other than the enclosure that is factory integrated with the array
    • Ensure, for the HPE 3PAR StoreServ 8000 or 9000 Virtual Service Processor software that the Customer-supplied host is fully assembled, configured, installed in the same rack as the HPE 3PAR 8000 or 9000 Storage product, and ready for HPE to install and configure the Virtual Service Processor software
    • Adhere to licensing terms and conditions regarding the use of any HPE service tools used to facilitate the delivery of this service or support tools used to provide ongoing remote monitoring, if applicable
    • Ensure that HPE 3PAR Operating System upgrades or patches are compatible with the Customer’s host and SAN environment before HPE initiates upgrade installation and installation of any required upgrades or patches
    • Be responsible for all data backup and restore operations
    • Provide a suitable work area for service delivery, including access to an outside telephone line, power, and any network connections required
    • Allow HPE full and unrestricted access to all locations where the service is to be performed
    • Perform other reasonable activities to help HPE identify or resolve problems, as requested by HPE
  • General provisions / other exclusions

    • The service is delivered on a single HPE 3PAR StoreServ Storage product at one physical site.
    • HPE reserves the right to reprice this service if the Customer does not schedule and provide for subsequent delivery within 90 days of purchase.
    • HPE reserves the right to charge, on a time-and-materials basis, for any additional work over and above the service package pricing that may result from work required to address service prerequisites or other requirements the Customer does not meet.
    • HPE’s ability to deliver this service depends on the Customer’s full and timely cooperation with HPE, as well as the accuracy and completeness of any information and data the Customer provides to HPE.
    • The service is delivered during local HPE standard business days and hours, excluding HPE holidays. Service delivery outside these hours is available and subject to additional charges.
    • This service is delivered as a single, contiguous event. If Customer resource availability or other Customer restrictions delay installation or require additional visits beyond the defined scope of the service, additional charges may apply.
    • The service is delivered remotely or on-site, at HPE’s discretion.
    • Travel charges may apply; consult a local HPE office.

    Activities such as, but not limited to, the following are excluded from this service:

    • Service deployment on hardware not covered by an HPE warranty or service maintenance contract
    • Service deployment on hardware covered by an unauthorized third-party maintenance contract
    • Services that, in the opinion of HPE, are required due to unauthorized attempts by third-party personnel to install, repair, maintain, or modify hardware, firmware, or software
    • Service required due to causes external to the HPE maintained hardware or software
    • Any services not clearly specified in this document
    • Customer acknowledges and agrees that HPE may use resources outside the country of purchase for delivery of these services unless otherwise specified as part of a service feature description
    • To the extent HPE process personal data on the Customer’s behalf in the course of providing services, the HPE Data Privacy and Security Agreement Schedule — HPE Support and Professional Services found at hpe.com/us/en/legal/customer-privacy.html shall apply.
  • Supplemental terms

    The following supplemental terms apply to these services and take precedence in the event of any conflict:

    • Upon receipt of an acceptable order, HPE will contact the Customer within seven (7) business days to organize a service delivery date. Service delivery dates are subject to resource availability and may be scheduled up to 30 days from the order acceptance date.
    • The Customer must schedule and receive delivery of these services within 180 days from order acceptance. HPE reserves the right to reprice for services not scheduled and delivered within 180 days. Backorders or shipment delays may affect the delivery timeline. Orders for services will expire after 365 days (one year) from the order acceptance date for services not scheduled and delivered, and the Customer will not be entitled to a refund for the unused services.
  • Ordering information

    To obtain further information or to order HPE 3PAR StoreServ 8000, 9000, and 20000 Storage Installation and Startup Service, contact a local HPE sales representative and reference the following product numbers:


    For the HPE 3PAR 8000:

    • HA114A1#5XN for HPE 3PAR 8200 2-Node Storage Centric Base Installation and Startup Service (see Note 1 for more information)
    • HA114A1#5XP for HPE 3PAR 8200 2-Node Storage Base Installation and Startup Service (see Note 1 for more information)
    • HA114A1#5XQ for HPE 3PAR 84XX 2-Node Storage Centric Base Installation and Startup Service (see Note 1 for more information)
    • HA114A1#5XR for HPE 3PAR 84XX 2-Node Storage Base Installation and Startup Service (see Note 1 for more information)
    • HA114A1#5XS for HPE 3PAR 84XX 4-Node Storage Centric Base Installation and Startup Service (see Note 1 for more information)
    • HA114A1#5XT for HPE 3PAR 84XX 4-Node Storage Base Installation and Startup Service (see Note 1 for more information)
    • HA114A1#5XU for HPE 3PAR 8200 2-Node Field Integrated Base Installation and Startup Service (see Note 1 for more information)
    • HA114A1#5XV for HPE 3PAR 84XX 2-Node Field Integrated Base Installation and Startup Service (see Note 1 for more information)
    • HA114A1#5XW for HPE 3PAR 84XX 4-Node Field Integrated Base Installation and Startup Service (see Note 1 for more information)
    • HA114A1#5XX for HPE 3PAR 84XX Upgrade Node Pair Installation and Startup Service (see Note 1 for more information)
    • HA114A1#5XZ for HPE 3PAR 8000 Field Integrated Drive Enclosure Installation and Startup Service (see Note 1 for more information)
    • HA124A1#5MQ for HPE 3PAR 8000 Expansion Rack Factory Integrated Installation and Startup Service
    • HA124A1#5XY for HPE 3PAR 8000 Adapter Installation and Startup Service
    • HA124A1#5Y0 for HPE 3PAR 8000 Field Integrated Drive and Drive Enclosure Installation and Startup Service (see Note 2 for more information)
    • HA114A1#5VS for HPE 3PAR 2-Node Controller Conversion Installation and Startup Service
    • HA114A1#5VT for HPE 3PAR 4-Node Controller Conversion Installation and Startup Service

    For the HPE 3PAR 9000:

    • HA124A1#5JX for HPE 3PAR 9000 Base Factory Integrated Installation and Startup Service
    • HA124A1#5JY for HPE 3PAR 9000 Expansion Rack Factory Integrated Installation and Startup Service
    • HA124A1#5KT for HPE 3PAR 9000 Base Field Integrated Installation and Startup Service
    • HA124A1#5KZ for HPE 3PAR 9000 Drive Enclosure Field Integrated Installation and Startup Service
    • HA124A1#5LU for HPE 3PAR 9000 Adapter Field Integrated Installation and Startup Service
    • HA124A1#5LV for HPE 3PAR 9000 12 Count Drive Field Integrated Installation and Startup Service (see Note 3 for more information)
    • HA124A1#5LJ for HPE 3PAR 9000 Upgrade Node Installation and Startup Service
    • HA114A1#V0V for HPE 3PAR 9000 to Primera A670 2-Node Controller Upgrade Conversion Installation and Startup Service
    • HA114A1#V0W for HPE 3PAR 9000 to Primera A670 4-Node Controller Upgrade Conversion Installation and Startup Service

    For the HPE 3PAR 20000:

    • HA124A1#5X0 for HPE 3PAR 20000 4-Node Base Factory Integrated Installation and Startup Service
    • HA124A1#5WZ for HPE 3PAR 20000 8-Node Base Factory Integrated Installation and Startup Service
    • HA124A1#5X1 for HPE 3PAR 20000 Expansion Rack Factory Integrated Installation and Startup Service
    • HA124A1#5X4 for HPE 3PAR 20000 4-Node Base Field Integrated Installation and Startup Service
    • HA124A1#5X3 for HPE 3PAR 20000 8-Node Base Field Integrated Installation and Startup Service
    • HA124A1#5X5 for HPE 3PAR 20000 Drive Enclosure Field Integrated Installation and Startup Service
    • HA124A1#5X7 for HPE 3PAR 20000 Upgrade Unit of Service Installation and Startup Service (see Note 4 for more information)
    • HA114A1#V0V for HPE 3PAR 20000 to Primera A670 2-Node Controller Upgrade Conversion Installation and Startup Service
    • HA114A1#V0W for HPE 3PAR 20000 to Primera A670 4-Node Controller Upgrade Conversion Installation and Startup Service

    For all HPE 3PAR storage:

    • HA124A1#5ZF for HPE 3PAR Standalone Service Processor Installation and Startup Service (see Note 5 for more information)

    Notes

    1. Excludes field integration of drives into a storage base or drive enclosure. For field integration of drives, order the appropriate quantity of HPE 3PAR 8000 Field Integrated Drive and Drive Enclosure Installation and Startup Service (HA124A1#5Y0).
    2. Includes field integration of up to 12 drives in a storage base, upgrade node pair, or drive enclosure. Order an increment of service HA124A1#5Y0 for each drive enclosure and for each quantity of 12 drives that require field integration into a single HPE 3PAR StoreServ 8000 Storage array.
    3. Includes field integration of up to 12 drives in a drive enclosure. Order an increment of service HA124A1#5LV for each quantity of 12 drives that require field integration into a single HPE 3PAR StoreServ 9000 Storage array.
    4. For HPE 3PAR 20000 hardware upgrades, order the appropriate quantity of HPE 3PAR 20000 Upgrade Unit of Service Installation and Startup Service (HA124A1#5X7).
    5. Quoted only when the HPE 3PAR Service Processor is deployed later than the HPE 3PAR StoreServ Storage product, for example, when transitioning from a Virtual Service Processor to a physical Service Processor.

Recommended for you